Abstract
The significant growth of gas-fired power plants and emerging power-to-gas (PtG) technology has intensified the interdependency between electricity and natural gas systems. This paper proposes a robust co-optimization scheduling model to study the coordinated optimal operation of the two energy systems. The proposed model minimizes the total costs of the two systems, while considering power system key uncertainties and natural gas system dynamics. Because of the limitation on exchanging private data and the challenge in managing complex models, the proposed co-optimization model is tackled via alternating direction method of multipliers (ADMM) by iteratively solving a power system subproblem and a gas system subproblem. The power system subproblem is solved by column-and-constraint generation (C&CG) and outer approximation (OA), and the nonlinear gas system subproblem is solved by converting into a mixed-integer linear programming model. To overcome nonconvexity of the original problem with binary variables, a tailored ADMM with a relax-round-polish process is developed to obtain high-quality solutions. Numerical case studies illustrate the effectiveness of the proposed model for optimally coordinating electricity and natural gas systems with uncertainties.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.