Abstract

Robust solving of critical large power flow cases (with 50k or greater buses) forms the backbone of planning and operation of any large connected power grid. At present, reliable convergence with applications of existing power flow tools to large power systems is contingent upon a good initial guess for the system state. To enable robust convergence for large scale systems starting with an arbitrary initial guess, we extend our equivalent circuit formulation for power flow analysis to include a novel continuation method based on transmission line (Tx) stepping. While various continuation methods have been proposed for use with the traditional PQV power flow formulation, these methods have either failed to completely solve the problem or have resulted in convergence to a low voltage solution. The proposed Tx Stepping method in this paper demonstrates robust convergence to the high voltage solution from an arbitrary initial guess. Example systems, including 75k+ bus test cases representing different loading and operating conditions for Eastern Interconnection of the U.S. power grid, are solved from arbitrary initial guesses.Interconnection of the U.S. power grid, are solved from arbitrary initial guesses.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.