Abstract

As the sharp growth of gas-fired power plants and the new emergence of power-to-gas (PtG) technology intensify the interdependence between electricity and natural gas systems, it is imperative to co-optimize the two systems for improving the overall efficiency. This paper presents a long-term robust co-optimization planning model for interdependent systems, for minimizing total investment and operation costs. Beside generators, transmission lines, gas suppliers, and pipelines, PtGs and gas compressor stations are also considered as investment candidates to effectively handle wind power uncertainties in the power system and compensate pressure losses in the gas network. Furthermore, the proposed model includes a joint N-1 and probabilistic reliability criterion to promote economical and reliable planning solutions. The proposed model is solved via a decomposition approach, by iteratively solving a base-case master problem and two operation subproblems to check N-1 and probabilistic reliability criteria. Numerical case studies illustrate the effectiveness of the proposed robust co-optimization planning approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.