Abstract
The concept of partial demand uncertainty is introduced from the car sequencing problem (CSP) and incorporates special vehicle fleets in a demand plan. After establishing the working hypotheses with fleets, a mixed integer linear programming model, robust car sequencing problem (r-CSP), is proposed to satisfy the maximum number of CSP restrictions. Subsequently, multi-sequence production and metrics to evaluate its robustness are defined. The r-CSP considers various demand scenarios and functions to measure the excess of optional requirements in production programs. These functions are valid as objectives in optimization problems and as multi-sequence pro-duction robustness metrics. Keywords : Assembly lines, Sequencing, Car Sequencing Problem, Vehicle Fleets, Robust Optimization, Production Mix, Demand uncertainty.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.