Abstract

In this paper, authors considered a flow shop scheduling problem with sequence dependent set-up times in an uncertain environment. Its objective function is to minimise weighted mean completion time. As for uncertainty, set-up and processing times are considered not to be deterministic. Authors propose two different approaches to deal with uncertainty of input data: robust optimisation (RO) and fuzzy optimisation. First, a deterministic mixed-integer linear programming model is presented for the general problem. Then, its robust counterpart of the proposed model is dealt with. Afterwards, the fuzzy flow shop model is developed. Moreover, a real case study on Tehran-Madar Company which is a producer of printed circuit board and OEMs is studied. Finally, a considerable discussion is held on comparison of all three approaches of namely deterministic, fuzzy and ROs based on some generated numerical examples.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call