Abstract

Geometrically complex masonry structures built with traditional techniques typically require either temporary scaffolding or skilled masons. This paper presents a novel fabrication process for the assembly of full-scale masonry vaults without the use of falsework. The fabrication method is based on a cooperative assembly approach in which two robots alternate between placement and support to first build a stable central arch. Subsequently, the construction is continued individually by the robots - building out from the central arch based on an interlocking diagonal brick sequence. This proposed method is validated through its successful implementation in a full-scale vault structure consisting of 256 glass and concrete standardized bricks. The paper includes strategies for developing the design, sequencing, and robotic assembly methods used to build the vault.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.