Abstract

After risk identification and risk analysis done, so risk response is carried out. Risk response is handled by the service provider. Recommendation is the final result of risk management of road construction project waste material. The recommendation is the aggregate B and Ready Mix Concrete is necessary to pay attention to the waiting time and pay attention to the critical trajectory on material scheduling so that breakdowns and scheduling updates are made per week. Need to pay attention to rainfall and implementation methodology. Recommendations for lean concrete waste material are necessary to pay attention to the waiting time and pay attention to the critical trajectory on material scheduling so that breakdowns and scheduling updates are carried out per week. Need to pay attention to rainfall and implementation methodology. And the causes for minimizing waste material must be considered.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call