Abstract

This paper presents a case study entailing the reconstruction of a road bridge. The original timber construction low-level bridge with rolled steel girders had lost its performance parameters due to biological corrosion of the structural timbers. The support piles were defective. The structure was taken out of use and a solution was proposed in the form of a composite span structure founded on prefabricated reinforced concrete piles. It is important to pay attention to the economic considerations of the reconstruction, as managers of lower category roads often only have a rather limited budget.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.