Abstract

AbstractEPA's Risk Management Program regulation, promulgated in June 1996 as 40 CFR Part 68 requires subject industries to submit Risk Management Plans by June 1999. This plan requires hazard assessment of the operations of a facility using worst case scenarios and alternative releases. EPA has provided an Off‐site Consequence Analysis (OCA) guidance to help facilities in their hazard assessment.OxyChem will be significantly impacted by the RMP rule. This paper outlines OxyChem's general experience and its strategy in planning to comply with this rule. OxyChem's approach in the development of the scenarios required by the rule is described in this paper. Limitations involved in the use of EPA's look‐up tables or a single modeling solution for conducting all of the OCA are discussed. A three tiered OCA approach is presented as a possible alternative.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.