Abstract
According to the characteristics of the subway tunnel method construction and the special operation requirements of the highway, many risks of undercrossing engineering should be required urgent attention. So, based on one subway tunnel undercrossing the existing highway, the possible sources of risk are defined and analyzed. Furthermore, according to the evaluation method of fuzzy mathematics, for soft and hard strata complicated geological environment, the assessment and grading of risk sources are investigated during the subway tunnel undercrossing the existing highway. Those results are supporting the important suggests for constructors and designers
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: DEStech Transactions on Environment, Energy and Earth Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.