Abstract
In this article, we describe a basic mechanism by which risk events can induce indirect value losses to the risk owner: a value loss arising from a risk event interfering with activities that have no logical connection with the risk event other than that of having the same owner; a mechanism we have named Structural Risk. This effect is caused by the occurrence of a resource fluctuation which challenges the risk owner's ability to gain control of adequate resources, thus forcing the risk owner to prioritize and terminate other activities and projects. In this process value is destroyed. The risk cost component presented in this article, whose existence has previously been argued in the risk literature, has been documented in a single factorial experiment with a unique simulation device named Risky Business. Through our experiments, we have shown that the first response of subjects exposed to large risk events is to mitigate the consequences of the risk event through negotiating with the environment. If such negotiations fail, the subject will have no alternative but to let other activities and projects under direct control of the risk owner suffer. We end the article with conjectures and implications for ERM, suggesting the addition of a risk resource forecast and discussing implications for four types of risk mitigation strategies: capital requirements, risk diversification, network relations and insurance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.