Abstract

In order to ensure the highway design and construction turnkey project smooth implementation, it is necessary to proactively consider risks produced by highway design and construction turnkey model, and to input specific risk prevention and corresponding risk control measures. This paper firstly discusses risk control measures for highway design and construction turnkey model. Then, risk is reasonably contributed both the owners and general contractors. The risk range has also be defined between the owner and general contractor. In the ending of this article, there are some recommendations about risk prevention and control measures for highway design and construction turnkey project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.