Abstract

Under the background of continuous urbanization in China, urban underground comprehensive pipe gallery will become an inevitable trend of urban comprehensive management in the future. After the completion of the management gallery, how to effectively manage the risks in operation and maintenance management has become a topic at this stage. Based on the classic method of AHP combined with DSM method, and through a lot of literature research, to build the relationship between the risk of an integrated pipe rack system, and has carried on the system dynamics simulation using Anylogic software, finally, the simulation results obtained a few of comprehensive pipe gallery has the greatest effect in the overall risk of several risk paths, convenient operational phase in the pipe gallery risk in the future, you can draw on the results of several path for more effective management.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.