Abstract

According to the characteristics of international DCS project that benefit and risk coexist, the multilevel fuzzy comprehensive evaluation model covering Delphi, AHP (Analytic Hierarchy Process) and Fuzzy Comprehensive evaluation Model will be introduced into the international DCS project risk analysis. Taking Salah Al-Din Fuel Gas Power Plant DCS project In Iraq as an example, we successfully carries on the comprehensive evaluation of risk model. The evaluation results shows strong systemic and practical. It also provides strong support for project risk management and decision-making.