Abstract

Projects for the regulation of torrent basins carry various unforeseen adverse effects that may result in breached deadlines, increased costs, a reduction of quality etc. The paper presents the basic characteristics and most frequent risks associated with erosion control. Furthermore, it provides an overview of risk management through its basic stages - starting from risk identification and risk analysis to risk responses, including the methods used for risk analysis. As a part of quantitative methods for risk analysis, the Monte Carlo method is presented as the one most frequently used in simulations. The Monte Carlo method is a stochastic simulation method consisting of the following stages: the identification of criterion and relevant variables, the allocation of probability for relevant variables, the determination of correlation coefficient among relevant variables, simulation execution and result analysis. This method was applied in the analysis of the total cost of the project for the basin regulation of the Dumaca River in order to determine the funding that would be used as a backup in case of unforeseen events with a negative impact. The project for the regulation of the Dumaca River includes basin regulation in the form of complex flow profile and the lining of zones where necessary in terms of stability. The total cost is presented as a sum of costs of all works (preliminary works, earthworks, masonry works, concrete works and finishing works). The Monte Carlo simulation for cost analysis is carried out using the Oracle Crystal Ball software with its basic steps described in the paper. A sum of funding needed as a financial backup in case of unforeseen events with negative effects is obtained as the simulated total cost of the project.

Highlights

  • Projects for the regulation of torrent basins, as well as investment projects in general, can be overloaded with numerous adverse risk events at all stages of the project life cycle

  • This method was applied in the analysis of the total cost of the project for the basin regulation of the Dumača River in order to determine the funding that would be used as a backup in case of unforeseen events with a negative impact

  • A sum of funding needed as a financial backup in case of unforeseen events with negative effects is obtained as the simulated total cost of the project

Read more

Summary

Introduction

Projects for the regulation of torrent basins, as well as investment projects in general, can be overloaded with numerous adverse risk events at all stages of the project life cycle. There may be unwanted events such are breached deadlines and inability to supply materials which lead to higher costs of construction. Risk can be defined as a possible realization of unwanted consequences of an event. The risk represents likelihood that a project will have an unfavorable outcome. Most commonly, it is associated with financial effects, since all other effects such as the realization deadline, poor quality of built-in material and completed works can be brought down to financial indicators (Suđić, 2012)

Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.