Abstract

The paper analyses the literature on risk management in mega-projects suggesting possible mitigation actions to be considered in the stakeholders' management. EXPO 2015 represents a perfect project to understand the strength of a rigorous methodological approach to uncertainty and the need for a mature consciousness at managerial level on these topics. Analysing real available data on this project, the number of visitors appears overestimated, so, by adopting a framework, called SHAMPU, the paper quantifies the relative impact and provides possible mitigation actions. Practical actions crossing the risk management phases in mega projects proposed by literature are suggested in the conclusions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.