Abstract

Managing claims is very essential for successful construction projects. For this, the identification of claims and the causes of occurrence of the claims are very crucial. Hence, this research investigated the types and causes of claims and their risk level in construction projects in Pakistan. The study was carried out based on a quantitative mode of research using a questionnaire survey. The survey was conducted amongst the professionals (client, consultant, and contractors) involved in handling construction projects. The survey was done by visiting the participants in person and electronically. A total of 51 completed questionnaire forms were received. Data were analyzed using the SPSS (v20) and Microsoft Excel spreadsheet program. The results suggested that payment-related issues, evaluation of the quality and quantity of completed works, Final cost, Awarding bid to the lowest bidder, and Change or variation orders are the top 5 claim causes with the highest risk level. At the same time, the top 5 types of claims with the highest risk level are Extra-work claims, Payment/Financial, Extension of time, Change claims, and Escalation. This study will help practitioners to recognize the risk-related issues of claims occurring in construction projects

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.