Abstract

This study aims to identify risks at the procurement stage of the glass facade of office buildings in Jakarta. In this study, the procurement phase was analyzed using the PMBOK reference (5th edition). In this research, the most dominant risk will be discussed at the stage of glass facade procurement in high-rise office buildings in Jakarta. After the dominant risk obtained from the analysis, the prevention and recommendations will be discussed. The number of risks that occur during the procurement process can certainly hamper the project. These risks can cause to the project completion time that are not in accordance with the project schedule. Besides that, the risks could make the project cost even greater. This certainly can lead to big loss to the project. Therefore, it is very important to identify the main risks at the procurement stage from the beginning of the construction process. According to the PMBOK, the stages of the procurement is divided into 4, which consists of plan procurement, conduct procurement, control procurement and close procurement. Based on the research results, obtained 47 risks that are divided into 4 phases of the procurement. Based on expert validation, 42 risks out of 47 risks were used in the analysis. This study uses the SPSS program to determine the most dominant risk. The SPSS results show that the variables X33 and X39 are the most dominant risks in the procurement stage of high-rise office building glass facades in Jakarta. These variables are the risk of material defects (X33) and late in ordering material (X39).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call