Abstract

There exists required safety integrity level (SIL) to assure safety in accordance with international standards for every electrical / electronics / control equipment or systems with safety related functions. The SIL is allocated from lowest level (level 0) to highest level (level 4). In order to guarantee certain safety level that is internationally acceptable, application of methodology for SIL allocation and demonstration based on related international standards is required. Especially, in case of the SIL allocation method without determining of quantitative tolerable risk, the additional review is needed to check whether it is suitable or not is required. In this study, the quantitative risk reduction model based on the safety integrity allocation results of railway platform screen door system using Risk Graph method has been examined in order to review the suitability of quantitative risk reduction according to allocated safety integrity level.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call