Abstract

Abstract Public-private partnerships (PPPs) are promoted as a practical option for developing countries to meet their water sector infrastructure gaps. Despite their appeal, PPP projects have been described as complex and challenging, and the water sector PPPs are particularly associated with high failure rates. Risk analysis and evaluations have been identified as critical to the success of PPPs. In this paper, we examine an on-going PPP arrangement for piped water supply in the Asutifi North District of Ghana under a Build, Operate, and Transfer arrangement. Safe Water Network will provide the supply systems and transfer ownership to the District Authority at the end of the contract. We reviewed key project documents to ascertain the measures that would minimize the likelihood of risk occurring during the project cycle. Of 11 risk factors, 7 were anticipated in the project documents. We recommend that project documents be reviewed and amended to address the unanticipated risks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.