Abstract

The risk of collaborative projects is complex, and generally no project can be used as a reference. So, the method which is used to evaluate the risk of traditional project is not proper for the collaborative project. Combining the triangular fuzzy number and analytic hierarchy process (AHP) method, a model for evaluating the risk of collaborative project is established in this paper. And a collaborative project is introduced as an example to demonstrate the process and validity of the model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.