Abstract

This paper extends the build–operate–transfer (BOT) concession model (BOTCcM) to establishing a risk concession model for BOT contract projects. The decision for a concession period is one of the most important decisions in determining a BOT contract. BOTCcM presents an alternative method to assist in determining a concession period that can protect the basic interests of both the investor and the government concerned. However, there is a major limitation in using the model, namely it gives no consideration to the impacts of risks on the estimation of various economic variables in the model. This study considers the risk impacts to the BOTCcM model and presents an additional risk concession model. This model provides an approach for formulating a concession period to consider the impacts of risks and, at the same time, protect the basic interests of both the investor and the government concerned. A hypothetical case is used to show the procedures of formulating the risk concession period through the assistance of the Monte Carlo simulation method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.