Abstract

Project Cost estimation is carried out for making investment decisions. Cost estimation is carried out during different phases of the project. Contingency in cost estimation is an important factor before releasing final cost estimate for formal approval of the project by senior management. Major Petrochemical companies use risk-based contingency calculation instead of following a standard practice of adding a certain fixed percentage to the final project cost estimate. In this chapter, cost contingency calculation methodology has been elaborated by conducting case study of a sample project. The methodology described here uses famous tool of Monte Carlo for simulation. It is pragmatic approach to calculate required cost contingency in the project cost estimate, based upon the particular project risks as compared to simply following rule of adding fixed percentage of the estimate as cost contingency in overall project cost estimate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.