Abstract
The project named "the rescue system and key technology of high-speed railway in perilous mountains" pri- marily focuses on current railway constructions and operations in China. To state the relationship between risk events and risk factors, we classified the risk sources of operating tunnels of high-speed railway in perilous and mountainous area and established a hierarchical assessment system by using the example of high-speed railway from Guangzhou to Guiyang. According to the risk acceptance criteria and risk level standard, we analyzed the risks of operating tunnels qualitatively and quantitatively by using AHP-Fuzzy method. As a result, the key risks were characterized and proposals were listed. Our study provides a framework for the risk analysis and management of operating tunnels of high-speed railway in peril- ous and mountainous area.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.