Abstract

AbstractIn the course of the preliminary planning of the new Gelnhausen–Fulda railway line which is part of the railway project Hanau–Würzburg/Fulda, two route options with tunnels, bridges, cuts and embankments are to be investigated and assessed as efficiently as possible with regard to potential geotechnical risk areas. Due to the geological and hydrogeological conditions within the north‐eastern Hessian Buntsandsteingebirge, several groundwater levels, landslides in tunnel portal areas and karstification structures are to be expected on the two route options, each of which is approx. 45 km long. In order to obtain detailed and, above all, large‐scale knowledge of geotechnical hazards of each route = in the preliminary stage of the exploration programme, geophysical surface investigations are a cost‐ and time‐optimized exploration method in addition to standard drilling. These findings as well as existing subsurface information are combined by means of BIM, so that risk areas can be identified at an early stage of the project and taken into account when selecting the most affordable route.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.