Abstract

Grid-connected photovoltaic power generation is an important form of new energy utilization, which can effectively reduce the dependence of power system on traditional energy sources. However, the randomness and uncertainty of the output of photovoltaic power generation system will also pose some risks to power grid dispatching decision-making. The source of dispatching decision risk is analyzed, and a risk index system including line overload risk, reserve shortage risk, load shedding risk and light abandonment risk is established. Then a risk assessment model for optimal dispatch of grid-connected photovoltaic power generation is established. The time of power flow calculation is greatly simplified by using power flow distribution factor. Finally, through the risk assessment of IEEE RTS-79 system scheduling decision-making, the risk of scheduling decision-making under different photovoltaic acceptance is analyzed, and the feasibility of the model is verified.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call