Abstract
Energy supply remains the greatest challenge for many of Eastern European countries and their economy. In post-soviet and ex-Yugoslavian countries, till today there exists a system where some of the power plants rely on high voltage (HV) and medium voltage (MV) power grids in the process of distribution of electric energy (EE) to final consumers. This makes them vulnerable to solar storms due to HV power transformers which are especially sensitive to geomagnetic induced current (GIC). The acquisition of electrical power infrastructure could put the electrical infrastructure out of service from a couple of months to a year or more. Loss of income, for ordinary families, is a primary hazard of a long power outage. Business continuity of industry and other critical infrastructures (CI) is important in this scenario, but it is a significant challenge for small businesses and enterprises as well. This paper introduces ISO 31000 standard to such scenarios with the primary goal of achieving resilience of companies against such disaster as a new method of vial response to avoid scope of similar hazards.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.