Abstract

An integrated simulation and risk-assessment approach is proposed, which includes a multi-phase and multi-component modeling system for simulating flow and transport of petroleum constituents in the subsurface and a fuzzy relation analysis (FRA) model for assessing environmental risks under uncertainty. Outputs of the simulation modeling were directly input into the FRA model to comprehensively evaluate integrated risk due to transport of multiple petroleum constituents in groundwater system to receptors of concern. Application of the integrated simulation and risk-assessment approach to a petroleum-contaminated site indicates that reasonable solutions have been generated. They are useful for providing decision-support for management and remediation of petroleum-contaminated sites.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.