Abstract

This paper presents results of a scientific project investigating the possibilities for applying a risk assessment model structure in a chosen “SEVESO” establishment process. This model was mainly created from the block diagram structures where methods and techniques in different kinds of steps were applied. And therefore it was verified that this model is suitable and applicable for these kinds of industrial processes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.