Abstract
the whole process of risk assessment is a necessary part of the project preparation stage, which can avoid the risk factors and ensure the safety of the project. However, the existing assessment methods have the problem of weak control. Given this situation, a project whole process risk assessment method based on fuzzy comprehensive evaluation is proposed. Based on fuzzy comprehensive evaluation model, the risk weight is solved. The relevant influencing parameters are combined. The value range of the interdependence index is determined, and the calculation of risk factors is completed. Then, the standard evaluation data is fused by filtering high-risk data so as to deduce the core evaluation criteria. Complete the design of the whole process risk assessment method of the project based on a fuzzy comprehensive evaluation. The experimental results indicate that the fuzzy comprehensive evaluation model can greatly reduce the value of the key evaluation parameters, which can play a promoting role in avoiding risk factors and completing the accurate evaluation of the whole process of project risk.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.