Abstract

In the global construction market, most construction companies are willing to undertake international projects in order to maximize their profitability by taking advantage of attractive emerging markets and minimize dependence on local market. Due to the nature of construction works, there are lots of risks and uncertainties associated with the company and project conditions. Therefore, how the profitability of the project changes with occurrence of various risk events, in other words, the sensitivity of project costs to risk events, should be estimated realistically. This paper offers a comprehensive risk assessment methodology that provides a decision support tool, which can be utilized through the bidding decisions for international construction projects introducing a risk model that facilitate this assessment procedure, prioritize these projects and evaluate risk contingency value. The risk models is developed using the analytic hierarchy process (AHP) to evaluate risk factors weights (likelihood) and FUZZY LOGIC approach to evaluate risk factors impact (Risk consequences) using software aids such as EXCEL and MATLAB software. The reliability of the developed software has been tested by applications on a real construction projects. The proposed methodology and decision support tool have been proved to be reliable for the estimation of cost overrun due to risk while giving bidding decisions in international markets. Therefore, the developed model can be used to sort projects based upon risk, which facilitate company’s decision of which project can be pursued. The developed risk model is validated, which prove its robustness in risk assessment (97%) in company level and (105%) in project level. It can also be used to sort construction projects based upon risk. The developed contingency risk model demonstrate the ability to evaluate risk contingency value by aggregating rules combining company risk index and project risk index using fuzzy logic approach and MATLAB software.

Highlights

  • Risks cause cost overrun and schedule delay in many projects

  • The subjective judgment could not determine the exact influence of the qualitative decision factors on the project risk

  • The decision to attend to international construction projects demand a good identification and consideration of several simultaneous dimensions

Read more

Summary

Introduction

Risks cause cost overrun and schedule delay in many projects. The effectiveness of risk management becomes an important issue in project management [15]. The subjective judgment could not determine the exact influence of the qualitative decision factors on the project risk. The aforementioned decisions are complex as they are influenced by several parameters and because most parameters have a subjective, non-quantifiable, nature. Construction projects are exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. DSS were meant to be adjunct to decision makers, to extend their capabilities but not to replace their judgment [4]. It is a suitable technique to deal with the out of control factors: site, labour, equipment, climate, unforeseen circumstances, time dependence situations, and regulations [14]

Objectives
Methods
Results
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call