Abstract

PurposeRisk analysis is required by various laws and regulations in Germany and has an impact on each department of a large clinic. We provide an overview of the relevant laws and regulations in Germany and present the technical and organizational experience of introducing risk analysis in the Department of Radiation Oncology at the Universitätsklinikum Erlangen. MethodsRisk analysis was performed with an in-house developed extension of our intranet platform and ticketing system. Risks were classified according to occurrence and severity, each on a 5-level scale resulting into a risk matrix. An interdisciplinary team of six experienced members formed the core meeting weekly. ResultsA total of 38 risks and 50 measures have been identified in 41 1h-meetings corresponding to approx. 260 working hours. Risk was distributed 8/20/13 to the categories critical (n=8), monitoring (n=20), and conditionally acceptable (n=13). Risk analysis has been evaluated before and after introducing measures. ConclusionThe risk analysis method introduced has been successfully used in routine operations for over a year. Risk analysis takes time and effort. However, because experts from different disciplines meet each other every week, the overall workflow of the radiation oncology department can be improved efficiently and continuously.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.