Abstract

This paper documents the existence of a significant forecast error on crude oil futures. We interpret it as a risk premium, which, in part, could have been explained by means of a real-time U.S. business cycle indicator, such as the degree of capacity utilization in manufacturing. This result is robust to the specification of the estimating equation and to the considered business cycle indicator. An out-of-the-sample prediction exercise reveals that futures adjusted to take into account this time-varying component produce significantly better forecasts than those of unadjusted futures, of futures adjusted for the average forecast error and of the random walk, particularly at horizons of more than 6 months.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.