Abstract
This article presents a novel approach to estimate severe riser slug build up time and consequently the slug period. The slug model is based on a simplified mechanical model. This information has subsequently been used to illustrate the effects of the traditional actions to prevent severe riser slugging. New field data from an offshore floating production platform and large scale experimental data are included. The experimental set up is described in detail. The estimate on the slug built up time provided by the simplified model matches data from the experiments, the full scale data and data in relevant references. Published in SPE Journal of Production and Facilities August 2004, SPE 87355.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Modeling, Identification and Control: A Norwegian Research Bulletin
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.