Abstract

AbstractA key element in moving a highway construction project forward is the ability to acquire the right-of-way (ROW) in a timely manner. Delay in the acquisition process can lead to major delays to the construction phase. Identifying the delay factors will allow for a better acquisition management process. Thirty-five projects, with 1,478 parcels, acquired by the Mississippi Department of Transportation (MDOT) were randomly selected for analysis to determine the factors affecting acquisition duration. The data were analyzed using Statistica7 software with t-test, correlation, scatter plot, and analysis of variance to gain understanding of the dataset; to test the null hypothesis (Ho) that no correlation exists between the control and experimental variables; and to statistically quantify the factors that contribute to acquisition duration delay through significance and standard multi- regression analysis. Condemnation ratio, number of revisions (design changes), and number of parcels per project were id...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.