Abstract
The Relativistic Heavy Ion Collider (RHIC) was commissioned in 1999 and 2000. RHIC requires power supplies to supply currents to highly inductive superconducting magnets. The RHIC Insertion Region contains many shunt power supplies to trim the current of different magnet elements in a large superconducting magnet circuit. Power Supply current error measurements were performed during the commissioning of RHIC. Models of these power supply systems were produced to predict and improve these power supply current errors using the circuit analysis program MicroCap V by Spectrum Software (TM). Results of the power supply current errors are presented from the models and from the measurements performed during the commissioning of RHIC.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.