Abstract

The RFX-mod2 installation is planned to be completed by 2024 and the start of operations is expected in 2025. The high flexibility of the machine (already tested in the previous RFX-mod experiment) allows operation in Reversed Field Pinch and tokamak configuration as well as ultra-low q pulses. In this work we present predictive analysis on transport, performances and plasma control in RFX-mod2 in view of the first experimental campaigns.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.