Abstract
In this article, dynamic resource allocation (DRA) policies for aerospace maintenance operations, enabled by deployment of radio frequency identification (RFID) technologies, are studied via simulation. Similar to a typical aircraft maintenance, repair and overhaul (MRO) type of flow line (i.e. pulse line), each station in the simulated model consists of operation sequence alternatives, as well as resource alternatives for each operation. The simulation study investigates station selection rules for real-time resource sharing, resource selection rules among alternative resources at station level, and number of resource duplicates available in a manufacturing flow line in terms of their effect on system throughput, manufacturing lead time, resource utilisation levels and process wait time for resources. With input provided by an aerospace company, a hypothetical maintenance line with 10 stations is modelled using the Arena™ Simulation package and experimental results are statistically analysed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Computer Integrated Manufacturing
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.