Abstract
An RF-driven ion source has been put into commissioning on the China Spallation Neutron Source (CSNS) accelerator since September 2021. In the last two run cycles, the ion source has operated for 310 and 323 days respectively, with an availability of almost 100%. To fully meet the requirements of the CSNS project Phase-II (CSNS-II), the beam intensity from the linac should be enhanced to above 40mA, and the transverse emittance should be minimized to suppress beam loss during acceleration and transportation. A new test bench consisting of an ion source and a LEBT has been constructed to carry out these optimization and research. The featured functions of the LEBT are associated with proton elimination and electrostatic beam chopping. This report covers the operation status and development of the RF-driven H− source and the new LEBT.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.