Abstract
The Linear IFMIF Prototype Accelerator (LIPAc) is designed to accelerate 125mA of deuteron beam to 9MeV in continuous wave (CW). The superconductive RF Linac has not yet been installed and the final accelerating stage now under commissioning is the RFQ. This system has been designed and developed by INFN (Italy) before installation in QST (Japan). The RFQ is the longest in the World with its 9.8m and requires RF power injection from 8 independent and synchronized coupler ports. LIPAc demonstrated the acceleration of 125mA deuteron beam at 5MeV for 1ms with a 1s repetition period in 2019. A fundamental milestone to extend beam operations to CW is the completion of the RFQ cavity RF conditioning up to CW. This work presents the strategy followed to successfully reach CW RF injection at 80% of the nominal 132kV vane voltage. The field distribution correction scheme (acting on cooling system at various power levels) was successfully verified. We discuss as well the main challenges encountered on the way, which include updates of the RF system, failure of a circulator (by arcs) and the damages occurred on some of the RF couplers. Finally, the recent status and outlook will be provided.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.