Abstract

A series of new cycloaliphatic epoxies were synthesized which have either secondary or tertiary ester bonds between cross-link sites. Thermal analysis data shows that the anhydride-cured epoxies with tertiary ester bonds can decompose at ∼220 °C, while those with primary ester links decompose at ∼340 °C. Dynamic mechanical analysis reveals that these new thermosets retain moduli comparable to the non-reworkable commercial thermosets with similar structure.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.