Abstract

We study the material requirements planning (MRP) system nervousness problem from a dynamic, stochastic and economic perspective in a two-echelon supply chain under first-order auto-regressive demand. MRP nervousness is an effect where the future order forecasts, given to suppliers so that they may plan production and organise their affairs, exhibits extreme period-to-period variability. We develop a measure of nervousness that weights future forecast errors geometrically over time. Near-term forecast errors are weighted higher than distant forecast errors. Focusing on replenishment policies for high volume items, we investigate two methods of generating order call-offs and two methods of creating order forecasts. For order call-offs, we consider the traditional order-up-to (OUT) policy and the proportional OUT policy (POUT). For order forecasts, we study both minimum mean square error (MMSE) forecasts of the demand process and MMSE forecasts coupled with a procedure that accounts for the known future influence of the POUT policy. We show that when retailers use the POUT policy and account for its predictable future behaviour, they can reduce the bullwhip effect, supply chain inventory costs and the manufacturer’s MRP nervousness.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.