Abstract

In order to help the operation of constant current, the optics of booster to storage ring transport line (BTS) design is reinvestigated[1]. The initial Twiss parameters are derived by measurement. The optics of the transport line is readjusted according to the measured initial beam parameters. The design of pulse width of the injection kicker is also changed from 1.2 μs to 2.0 μs. The injection scheme is reviewed and the effects of the kicker error on both injected and stored beam are investigated and shown in this report.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.