Abstract

The global trend in electricity market has put pressure for Malaysia to restructure industry to be more reliable, transparent, efficient and sustainable. Besides, centralized power purchasing units that exist within a vertically-integrated entity have been criticized for failure to provide a truly playing field for the player in the generation sector competing to sell power to the single buyer. The Malaysian Electricity Supply Industry (MESI) has gone through various stages of reform and has evolved from predominantly single entity to a multiplayer industry particularly in the generation sector. This literature review covers the evolution of MESI from the introducing of the Independent Power Producers (IPPs), issues surrounding and implementation of single buyer which had continued until now. The MESI reformed a single buyer functional structure and framework is also included. However, this model does not offer transparent competition. Thus, other alternative electricity market model, pool/hybrid market model could be applied in order to carry on the MESI previous plan towards restructuring. The significance and relevance of the pool market model and its advantages in the Malaysian context is also discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.