Abstract

The Premiere MTH is an apartment complex located in South Jakarta, constructed on land with a hard soil layer extending deeper than 16 meters. Given these conditions, a bored pile foundation was selected as the optimal solution. This foundation type can be tailored to the necessary depth while minimizing disruption to nearby structures during installation. A bored pile is a type of deep foundation created by drilling into the ground to a specified depth. The process involves drilling a hole with specialized equipment, inserting a steel reinforcement cage, and then pouring concrete into the hole. Special tools are used to lift and position the casing and reinforcement. Once the concrete is poured, the casing is removed. According to the design analysis, the bored pile foundations used in this project have a diameter of 800 mm, with varying depths of 30 m and 35 m.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.