Abstract

The muon detector system of CMS consists of 3 sub detectors, the barrel drift tube chambers (DTs), the end cap cathode strip chambers (CSCs) and the resistive plate chambers (RPCs). During the last years the layouts of the sub detectors have been optimized by testing several prototypes. Now the project is frozen and the mass production of the chambers has started. Several production centers are coordinating their efforts. The muon system will be completed within September 2005. The final detectors, the construction status and planning and some test of the produced chambers will be presented.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.