Abstract

Abstract Full impact of one Large Hadron Collider (LHC) 7 TeV proton beam on solid targets made of different materials including copper and carbon, was simulated using an energy deposition code, FLUKA and a two-dimensional hydrodynamic code, BIG2, iteratively. These studies showed that the penetration depth of the entire beam comprised of 2808 proton bunches significantly increases due to a phenomenon named hydrodynamic tunneling of the protons and the shower. For example, the static range of a single 7 TeV proton and its shower is about 1 m in solid copper, but the full LHC beam will penetrate up to about 35 m in the target, if the hydrodynamic effects were included. Due to the potential implications of this result on the machine protection considerations, it was decided to have an experimental verification of the hydrodynamic tunneling effect. For this purpose, experiments were carried out at the CERN HiRadMat (High Radiation to Materials) facility in which extended solid copper cylindrical targets were irradiated with the 440 GeV proton beam generated by the Super Proton Synchrotron (SPS). Simulations of beam-target heating considering the same beam parameters that were used in the experiments, were also performed. These experiments not only confirmed the existence of the hydrodynamic tunneling, but the experimental measurements showed very good agreement with the experimental results as well. This provided confidence in the work on LHC related beam-matter heating simulations. Currently, a design study is being carried out by the international community (with CERN taking the leading role) for a post LHC collider named, the Future Circular Collider (FCC) which will accelerate two counter rotating proton beams up to a particle energy of 50 TeV. Simulations of the full impact of one FCC beam comprised of 10,600 proton bunches with a solid copper target have also been done. These simulations have shown that although the static range of a single 50 TeV proton and its shower in solid copper is around 1.8 m, the entire beam will penetrate up to about 350 m in the target. Feasibility studies of developing a water beam dump for the FCC have also been carried out. A review of this work and its implications on machine protection system are presented in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.