Abstract
Schedule delays frequently occur in construction projects. Many methods have been developed and used to analyze and measure the schedule delay of construction projects. Selecting a suitable analysis methodology is a major task for resolving the schedule delay claims encountered. This study reviews 18 delay analysis methods, and compares in detail three process-based dynamic analysis methods, namely, the snapshot analysis method, the windows analysis method and the isolated delay type method. A dynamic method is ideal for resolving a delay claim, since it provides accurate analysis. The differences among the dynamic methods in terms of the capabilities, required documents, timing and analysis process are discussed to help delay analysts to select an appropriate method. Finally, this study attempts to propose six suggestions on developing an ideal analysis method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The Open Construction and Building Technology Journal
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.