Abstract

Failure to deliver orders because of low production capacity is one of the main problems faced by companies in the plastics sector. This has repercussions, creating customer dissatisfaction and directly affecting profits by increasing production costs. Among the main causes of these problems is production downtime, which is caused by high set-up times and machine failures during the production process. To solve these problems, a lean manufacturing model is proposed that includes 5S, SMED (Single Minute Exchange of Die), TPM (Total Productive Maintenance), and Jidoka tools. This model was validated in a company dedicated to the production of plastics by injection moulding, which resulted in an increase in OEE (Overall Equipment Effectiveness) of 13 per cent and a reduction in set-up times of 48 per cent. Keywords Lean Manufacturing; Efficiency; Plastic Industry; Preventive Maintenance; SME

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.