Abstract

Surface oil and gas treatment facilities in service for decades are likely to be oversized due to the natural depletion of their reservoirs. Despite these plants might have been designed modularly, meaning they comprise multiple identical units serving the same task, such units operate often in conditions far from the design. This work analyzes the revamping options of an existing upstream gas facility, chosen because representative of a wide set of plants. It presents a flexible process simulation model, implemented in the HYSYS environment and dynamically linked to an Excel spreadsheet, which includes the performance maps of all turbomachineries and the main characteristics of the investigated modifications. The model may be used to run simulations for various gas input conditions and to predict the performance over 1 year of operation and for different possible future scenarios. The first objective is to assess economically the considered options, which shall be applied only if yielding short return times of the investment since the reservoir is mature. Moreover, all options are appreciated adopting a figure of merit, here defined, that compares the overall energy consumption to the one calculated with state-of-the-art technologies. In addition, exergy and environmental analyses are executed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.